Architect Fees in Turkey: What Decides the Cost of Designing Your House
Two architects' quotes usually differ in scope rather than price. What sets an architect's fee in Turkey, what is often left out, and what the contract should say before you sign.

One of the first questions people ask an architect is "How much will the design cost?" A quote that answers with a single figure deserves a careful look, because "the architectural project" can mean just the drawings needed for a building permit, or a service that runs from the first concept to checks on site. For foreign owners the picture can be even less clear: the stages, the engineers involved and the official costs in Turkey may not match what you know from home. The only sound way to compare quotes, as we have learned from our experience on site, is to see in writing what each figure covers. Below are the factors that set the fee, the costs usually left out, and what the contract should say. We don't give figures here, because a meaningful figure can't exist before the project itself is defined.
Scope: which stages are included?
An architectural project is built up in stages, and which of them are included is the biggest factor in the fee:
- Concept: brief, site analysis, layout idea and alternatives
- *Preliminary design (avan proje):* measured plans, sections, elevations and 3D visuals
- *Permit drawings (ruhsat projesi):* the set submitted to the municipality for the building permit
- *Construction drawings (uygulama projesi):* scaled drawings and material information used on site
- Details: windows, stairs, wet areas, façade and roof junctions
- Architectural supervision on site: checking the work against the drawings and answering questions as they arise
A quote for permit drawings only and one that includes construction drawings and details are not describing the same job. The stages are explained in our article on architectural project stages.

The building and the plot
The larger the house, the more drawing and coordination it needs, but floor area alone is not enough. Two houses of the same size can be a simple volume, or a stepped building with wide openings, a basement and a pool. The number of floors, structural complexity, the density of façade and roof details and the type of use (family home, holiday let, commercial) all affect the work.
In Fethiye the plot is often as decisive as the house. On a slope there are level changes, retaining walls and vehicle access to solve; near the coast or in protected areas extra rules and the views of other authorities can come in; special provisions in the plan notes add complexity. How much work these bring becomes clear once the zoning status (imar durumu) and the site itself have been seen.

Engineering, interiors and costs usually left out
A building permit needs structural, electrical and mechanical (plumbing, heating and cooling) projects alongside the architectural one. These are prepared by the relevant engineers; the architect makes sure they all fit together. The quote should state clearly:
- Whether the engineering projects are included or contracted separately
- Who coordinates them
- Whether interior design and landscaping are in the scope
Some costs usually sit outside the design fee and need their own budget: the soil survey (zemin etüdü), surveying and setting-out by a licensed surveyor, municipal fees and charges, and the building inspection company (yapı denetim) required for the permit. Ask early which of these sits with whom. How interior design fees are made up is covered in what interior design fees include.
Revisions: set the limits early
Design matures through conversation, so revisions are normal. The problem is revisions with no limit. The quote should say how many rounds are included at each stage and how going back to an approved stage is charged. Moving a wall in the preliminary design is easy; major changes after the permit is issued may need a formal amendment to the approved project (proje tadilatı) and a new approval.
The Chamber of Architects' minimum fees
The Chamber of Architects of Turkey (Mimarlar Odası) publishes principles for minimum fees for architectural services and updates them regularly. The calculation is broadly based on the building's class, its area and the stages of service. We suggest checking current figures and the method directly with the Chamber; they also give you a reference point when comparing quotes. The engineering chambers have their own principles for engineering projects.
What the contract should say
- The stages and what is delivered at each: which drawings, at what scale, how many 3D visuals
- How each stage is approved (in writing)
- The number of revisions included and how extra ones are charged
- Payment stages tied to delivered and approved work, not to dates
- Who provides the engineering projects and other services
- Who follows the permit process at the municipality
- Rights to use the drawings and what happens if the architect of record changes (ask your lawyer about the legal detail)
If the contract is in Turkish, have it translated and checked by your own lawyer before signing. The construction side is covered in our article on turnkey construction contracts.
Cheap design, expensive build?
Not every low quote is poor value, and not every high one includes more work. But it helps to know that every detail left undrawn is a decision that will be made on site, with whatever is at hand that day. Without construction drawings and details, builders cannot price the same thing, and "it wasn't in the drawings" items appear later. It is more accurate to see the design fee as the part of the overall budget that settles decisions before they become expensive. In our quotes, stages and deliverables are listed one by one, design and construction appear on separate lines, and the team that draws the project also runs the site.
A decision not made on the drawing gets made on site, in a hurry.
How we take a project from concept to site in Fethiye is explained on our architect in Fethiye page.
Frequently asked questions
Can I use drawings made by an architect in my home country?
They can be a useful starting point, but permit drawings in Turkey have to follow the plot's zoning status and Turkish regulations, and be prepared and signed by an architect who can take responsibility for them here. Confirm the details with the municipality before relying on them.
Is the design fee usually separate from the build cost?
It can be either. With a team that both designs and builds, both can sit in one contract; what matters is that design and construction appear as separate items. We show them on separate lines.
Can I order permit drawings only?
It is possible, and it may be enough to obtain a permit. But permit drawings leave out most of what builders need on site, so many decisions end up being made during construction and builders' quotes are hard to compare.
If you would like to define the scope and stages for your project, get in touch; once we have seen the plot and your brief, we will prepare a written quote.
- mimari proje bedeli
- mimarlık hizmet bedeli
- villa projesi
- sözleşme
- Fethiye

Related service
Architecture & Construction
Let's talk about your project
Your plot, your home or your renovation plan — we map out the way forward in the first meeting.
More articles

· 7 min read
Changing your mind during the build: the effect on cost and programme
Wanting changes once the walls go up is natural; what a change costs depends on the stage and on the work it undoes. Knock-on effects, substitute materials and a written change procedure, explained.
Read more →
· 5 min read
Designing an accessible, age-friendly home in Fethiye
Level access from the car, a plan you can live in on one floor, wider doors, a safe bathroom and good lighting. Planning a Fethiye home you can stay in for decades.
Read more →
· 7 min read
Choosing a Kitchen Worktop: Natural Stone, Quartz or Compact Laminate?
Granite, marble, quartz, porcelain, compact laminate, solid surface or wood: every worktop is strong in one way and sensitive in another. How to choose for the way your kitchen is used.
Read more →