Architectural Design Stages in Turkey: From Concept to Construction Drawings
Building a home in Fethiye? The design moves through concept, preliminary design, permit drawings and construction drawings. What you get and decide at each stage.

If you are building a home in Fethiye, especially for the first time in Turkey, it helps to know that "the plans" are not a single set of drawings. The design moves through stages, each with its own purpose and its own decisions. Knowing them lets you decide at the right moment and avoid expensive changes later. Below is the sequence we follow on houses and villas in Fethiye, from our experience on site.
1. First meeting and brief
It starts with how you want to live. Together we write the brief: bedrooms, bathrooms, guest space, a place to work, pool, garden, parking. Will you live in the house, let it in summer, or both? Which months will you be in Fethiye? We also talk about your budget range here, because most design decisions are made with cost in mind.
The result is a written brief. It looks simple, but every drawing that follows is checked against it.
2. Plot review and concept
Before designing, we look at the facts of the plot: the zoning status (imar durumu, issued by the municipality), building limits, height limit, slope, view, sun and wind, and road access. Some parts of Fethiye carry extra rules, such as coastal or conservation restrictions. Knowing these first prevents falling in love with a design that cannot be built.
The concept sets the main idea: how the house sits on the plot, which rooms face the view, how volumes and terraces are arranged. We usually discuss a few options and choose one.
3. Preliminary design (avan proje)
The preliminary design, called avan proje in Turkish, is the chosen concept drawn to scale for the first time: floor plans, sections and elevations. Room sizes, windows, the stair and the bathrooms are fixed here, and you start seeing the house inside and out in 3D.
Moving a wall on a drawing takes minutes; moving it on site costs time and money.
This is the cheapest stage to change your mind, so we recommend not rushing it, even if it takes a few rounds of revisions. Going to the permit stage before the layout is settled can mean amending the approved drawings later. If you live abroad for part of the year, this is also where 3D visuals do most of the work: decisions are made on images and in writing, not on site. More in our article on 3D visualisation.

4. Permit drawings
Once the preliminary design is approved, the drawings for the building permit (yapı ruhsatı) are prepared. Alongside the architectural drawings, Turkish permits need structural, electrical and mechanical drawings, and the architect coordinates them so they match. The application typically also includes the title deed (tapu), the zoning certificate, a soil survey report and a contract with a licensed building inspection company (yapı denetim). The exact list can vary by municipality; we confirm it for your project at the start.
Fethiye lies in an earthquake zone, and the structural design must comply with the Turkish Building Earthquake Code. The permit and occupancy process itself is covered in our article on building permits and iskan in Fethiye.
5. Construction drawings and details
Permit drawings show the building as it will be approved. On site, though, builders read from the construction drawings: how a wall is built, how a window is fitted, how a bathroom is waterproofed. These drawings contain scaled details, materials, joinery, floor build-ups, and bathroom and stair solutions.
Skip this stage and many decisions get made on site, with whatever is at hand, and the result often differs from what you expected. Construction drawings are also the basis of a fair quote: the clearer the drawings, the more itemised and comparable the price.
6. Interiors and materials
Do not leave the interiors to the end. The position of the kitchen, bathrooms and wardrobes, lighting and sockets, floor and wall finishes all affect the services drawings. Deciding them alongside the construction drawings means less breaking and redoing on site. We present material options to suit your budget and show each item separately in the quote.
7. The design on site
The design does not end when construction starts. When the architect who drew the house answers the questions that come up on site, the design survives into the building. Because the team that designs our projects also runs the site, that link is not lost: the cost of changes is seen in advance and responsibility stays in one place.
You can read how we run each stage on our architect in Fethiye page, and walk through finished projects as 360° tours on our projects page.
Frequently asked questions
What is the difference between preliminary design and construction drawings?
The preliminary design (avan proje) fixes the layout and the general appearance. Construction drawings are the detailed set used on site, with materials and details.
Are permit drawings enough to build from?
They are enough to get the permit, but not to get the house you expect. Without construction details many decisions are left to the site, which can mean surprises in time and cost.
Can I approve the design while living abroad?
Most of the design stage works well at a distance, with drawings, 3D visuals and written approvals. Official steps such as signing the permit application may need you in person or a power of attorney; confirm the details with a notary.
How long does the design stage take?
It depends on the size of the house, how quickly decisions are made and the preparation of the structural and services drawings. We agree a design programme at the start.
If you are planning a house or villa in Fethiye, get in touch and we will look at your plot and brief together and agree where to start.
- mimari proje
- avan proje
- uygulama projesi
- ruhsat projesi
- Fethiye

Related service
Architecture & Construction
Let's talk about your project
Your plot, your home or your renovation plan — we map out the way forward in the first meeting.
More articles

· 7 min read
Changing your mind during the build: the effect on cost and programme
Wanting changes once the walls go up is natural; what a change costs depends on the stage and on the work it undoes. Knock-on effects, substitute materials and a written change procedure, explained.
Read more →
· 5 min read
Designing an accessible, age-friendly home in Fethiye
Level access from the car, a plan you can live in on one floor, wider doors, a safe bathroom and good lighting. Planning a Fethiye home you can stay in for decades.
Read more →
· 7 min read
Choosing a Kitchen Worktop: Natural Stone, Quartz or Compact Laminate?
Granite, marble, quartz, porcelain, compact laminate, solid surface or wood: every worktop is strong in one way and sensitive in another. How to choose for the way your kitchen is used.
Read more →