Comparing building quotes in Turkey: how to read them line by line

When two quotes for the same house are far apart, they are usually not pricing the same house. How to read a Turkish building quote: scope, quantities, specification, exclusions, VAT, programme and payments.

Comparing building quotes in Turkey: how to read them line by line

You have two quotes on the table for your villa or renovation, and one is noticeably lower. The natural question is "which one is cheaper?", but the first question should be whether they are pricing the same house at all. From our experience on site, most of the gap between two totals hides not in the lines themselves but between them, in what has been left unwritten. Below is the order in which we read a quote, without figures, focusing on what to look for. It matters even more when the quote is in Turkish and full of unfamiliar terms.

1. Describe the same job to everyone

Quotes can only be compared if they are based on the same description of the work. Without drawings and a specification, each builder prices the house they imagine: one assumes thick insulation, another thin, and both are right. Before asking for prices, prepare:

  • architectural and engineering drawings, or measured drawings for a renovation;
  • a list of the main materials with their class and properties;
  • a written scope listing the work item by item.

If possible, give every builder the same list of items and ask them to fill in only the quantities and unit rates. In Turkey this kind of list is often called a keşif özeti (a bill of quantities). The two quotes then come back with the same lines. What drives renovation prices is covered in our article on what determines renovation costs.

2. Check four things on every line

A good line tells you what will be done, how much of it (metraj, the measured quantity), in which unit (m², m³, metres, number of items), and whether the price covers materials, labour or both. What we look for:

  1. Different quantities: if one quote shows far less bathroom tiling than the other, ask why. It could be wall height, wastage or a forgotten room.
  2. Different units: the same item may be priced per square metre in one quote and as a lump sum (götürü) in another; convert to the same basis before comparing.
  3. Lump-sum lines: the more lines that read "electrical installation: lump sum", the less you can see inside the quote. Ask for a breakdown of what each lump sum includes.
  4. Labour-only lines: an item whose materials you will buy separately makes the total look lower than it is.
Ankara Office: work area
Ankara Office: the work area of a 950 m² corporate office we completed on a turnkey basis

3. Specification: brand, model or "equivalent"

"First-class materials" is not a specification. For the critical items, the brand and range should be written down, or at least measurable properties: window profiles and glazing, the type and thickness of insulation, the waterproofing system, pipes and cables, sanitaryware and taps. These items are invisible in the finished house, and that is exactly where the difference between quotes tends to hide.

The phrase "or equivalent" (veya muadili) is not a problem in itself; it gives flexibility in supply. What matters is that the properties the equivalent must meet are defined, and that any substitution needs written approval.

4. Exclusions: the silent lines

The most common reason a quote looks low is what it leaves out. Every quote is different, but these are items we often see excluded:

  • municipal fees (harç) and other official costs;
  • electricity, water and sewer connections and utility subscriptions;
  • site power and water, removal and disposal of excavated soil;
  • retaining and boundary walls, landscaping and irrigation;
  • pool equipment, the kitchen and wardrobes, white goods;
  • air conditioning and heating, light fittings.

Ask every bidder to mark the same list "included / excluded". Ask about VAT (KDV) separately as well: if one quote includes it and the other doesn't, a large part of the difference may come from that alone.

EOSA Homes, Fethiye: villa completed with pool and garden
EOSA Homes, Fethiye: one of the villas we built together with its pool, terrace and garden

5. Time and money: programme, payments and price changes

A quote should come with a work programme showing the stages and dates, not just a completion date. Read the payment plan next to it: a large advance with light final stages shifts the risk onto you. Linking each payment to finished, inspected work rather than to calendar dates restores the balance; what is checked at each stage is explained in our article on construction stages and checks.

Whether the price is fixed, how items will be updated if material prices change, and how long the quote is valid should also be in writing. Itemised unit rates have one more advantage: extra work that comes up during the build can be priced at the same rates, so negotiation doesn't start from zero.

Look for the difference between two quotes not in the total, but in the lines that aren't there.

6. After handover: responsibility and documents

The quote, or the draft contract, should also cover what happens after handover: who is responsible for which defects and for how long, whether manufacturers' documents will be handed over, updated drawings showing changes made on site, and who will follow up the occupancy permit (iskan). If none of this appears, it is a gap that will have to be discussed later. The headings a contract should cover are listed in our article on turnkey construction contracts. Before signing, have both the quote and the contract checked by a lawyer, and ask which language version will be binding.

7. A low quote is not a bad quote, but it should be explained

A lower price can come from efficient organisation or a realistic margin. Still, if several of these signs appear together, stop and ask: missing or vague items, quantities clearly below the others, undefined materials, an ambitious timescale and a large advance. Ask the bidder to explain, line by line, where the difference comes from; a quote that can explain its difference is one you can trust.

We prepare our own quotes itemised and in writing, with a work programme, and write the scope, material classes and payment stages into the contract in the same detail. Because the architect who designs the house also runs the site, what is described in the quote is what gets built.

The way our construction process starts, with an itemised quote and a work programme, is explained on our construction in Fethiye page.

Frequently asked questions

How many quotes should I get?

The number matters less than making sure they are based on the same drawings and the same list of items. A few quotes on one description of the work tell you more than many quotes built on different assumptions.

Can I get comparable quotes without drawings?

It is difficult, because each builder prices their own assumptions. Even for a small renovation, a written scope and a materials list make quotes comparable.

Why does it matter whether VAT is included?

Two quotes for the same work at the same price will look different if one includes VAT and the other doesn't. Bring every quote to the same basis before comparing.

I'm abroad; how can I compare quotes properly?

Ask for every quote itemised on the same list, with exclusions marked and a work programme attached. Have the documents translated by someone you trust, and agree any questions and changes in writing.

If you would like help reading the quotes you have, or an itemised quote for your project, get in touch; we will look at the job on site and write the scope together.

  • inşaat teklifi
  • teklif karşılaştırma
  • inşaat sözleşmesi
  • villa inşaatı
  • Fethiye