Renovating an old apartment in Fethiye: 10 common mistakes to avoid
Bought a resale apartment in Fethiye and planning to renovate? These are the mistakes we see most often, why they matter and what to do instead.

Many people who buy property in Fethiye start with a resale apartment in Çalış, Fethiye town or Hisarönü and plan to "freshen it up". The visible parts get all the attention: a new kitchen, a new bathroom, new floors. But the result usually depends on decisions nobody sees once the job is finished. Here are the ten mistakes we come across most often, from our experience on site, with what to do instead.
Before the work starts
1. Skipping the site survey
A price given from photos or a phone call will change the moment a wall is opened. In older Turkish apartments the routes of pipes and cables, damp, wall condition and ceiling heights can only be judged in person.
Instead: Start with an on-site survey and measurements. Checking the plumbing, wiring, wet areas and structural elements at this stage sets the basis for every later decision.
2. No written scope
"We're redoing the bathroom" means different things to different people. One person means new tiles; another means new pipes, waterproofing and fittings.
Instead: Get the work written down room by room and item by item: what will be removed, what will be replaced, what stays. A written scope is the simplest protection against "that wasn't included" at the end, and it matters even more if you will be abroad for part of the job.
3. Comparing quotes by the total only
The difference between two quotes is usually in the scope, not the price. The cheaper one may simply leave out new plumbing or waterproofing.
Instead: Put the quotes side by side line by line. Are they pricing the same work with the same class of materials? We explain what drives renovation budgets in our article on renovation costs in Fethiye.
4. Choosing materials too late
If tiles, worktops or taps are chosen after work begins, either the team waits or whatever is in stock gets used. Both hurt the schedule and the budget.
Instead: Choose materials during the design stage, using 3D visuals, so you can see how each choice looks and what it costs before anything is ordered. This also works well remotely: you can review the visuals from home and approve them in writing.
During the work
5. Leaving old pipes and wiring under new tiles
Old pipes under new tiles will sooner or later mean breaking those tiles.
Plumbing and wiring in older apartments were not designed for today's appliances and air conditioning. Cover them with new finishes and the first leak or fault damages the new work.
Instead: If walls and floors are being opened anyway, assess the services and replace the lines that need it before any finish goes on.
6. Ignoring waterproofing
You can't see waterproofing when the job is done. You see it when it is missing, usually on the ceiling of the flat below.
Instead: Treat waterproofing as a non-negotiable layer in bathrooms, kitchens and on balconies, and ask for it as a separate line in the quote.

7. Too few sockets
Older apartments rarely have enough sockets for modern life. Cutting into a freshly finished wall later to add one is costly and frustrating.
Instead: Plan sockets and switches room by room once the furniture layout is clear: kitchen worktop, TV wall, bedsides, a desk, charging points, and outdoor sockets on the balcony.
8. Leaving lighting to the end
A single ceiling light in the middle of the room leaves most spaces flat and dim. If lighting is considered after the ceilings and wiring are done, the options shrink.
Instead: Plan general, task and accent lighting together with the electrical work. The kitchen worktop, the bathroom mirror and a reading corner each need their own light.
The building and the schedule
9. Ignoring the building management's rules
In Turkish apartment blocks the building management (yönetim) sets rules on working hours, lift use, removing rubble and protecting shared areas. Starting without knowing them can bring work to a halt.
Instead: Talk to the management first, learn the rules and let the neighbours know. One more point: load-bearing walls and columns must never be cut or removed without an engineering assessment. We cover this in our guide to earthquake safety and structure.
10. Starting without a schedule
When nobody knows which job comes when, trades wait for each other, materials arrive late and the job drags on. If the apartment is let in summer, that can mean missing the season.
Instead: Ask for a work schedule with start and end dates and clear stages. The duration is set once the scope is confirmed after the survey.
How we work
We start renovation projects with an on-site survey, prepare the design with 3D visuals and provide an itemised written quote and work schedule. Demolition, plumbing and electrics, flooring, custom joinery and installation are done by our own team under an architect's supervision, so you deal with one point of contact. See our Renovation & Refurbishment service page for details.
Frequently asked questions
Do I have to replace the plumbing in an old apartment?
Not always; the decision should follow the survey. But if walls and floors are being opened anyway, replacing problem lines before the new finishes go on is far more sensible than breaking them later.
Do I need a permit to renovate an apartment in Turkey?
Interior renovations that don't touch the structure, the façade or the use of the property usually do not require a building permit. Work that affects structural elements or the façade does, and building management rules apply separately.
Can the renovation go ahead while I'm abroad?
Yes, provided the scope, materials and schedule are agreed in writing before work starts.
If you are planning to renovate an apartment in Fethiye, get in touch with us; we will look at it on site and work out the scope and schedule with you.
- daire yenileme
- tadilat
- eski ev
- Fethiye

Related service
Renovation
Let's talk about your project
Your plot, your home or your renovation plan — we map out the way forward in the first meeting.
More articles

· 7 min read
Changing your mind during the build: the effect on cost and programme
Wanting changes once the walls go up is natural; what a change costs depends on the stage and on the work it undoes. Knock-on effects, substitute materials and a written change procedure, explained.
Read more →
· 5 min read
Designing an accessible, age-friendly home in Fethiye
Level access from the car, a plan you can live in on one floor, wider doors, a safe bathroom and good lighting. Planning a Fethiye home you can stay in for decades.
Read more →
· 7 min read
Choosing a Kitchen Worktop: Natural Stone, Quartz or Compact Laminate?
Granite, marble, quartz, porcelain, compact laminate, solid surface or wood: every worktop is strong in one way and sensitive in another. How to choose for the way your kitchen is used.
Read more →